Historical leads and palaeochannels
Recovery and georeferencing of historic plans, workings, drilling and production records, followed by landscape and drainage interpretation.

Services
Historical research, geomorphic interpretation, drilling and pitting programmes, bulk sampling, recovery data and staged evaluation for New Zealand alluvial gold projects.
Specialist services
Combine historical workings, geomorphology and direct sampling to test gravel continuity, gold distribution, recovery and mining constraints.
Recovery and georeferencing of historic plans, workings, drilling and production records, followed by landscape and drainage interpretation.
Test pits and drilling selected to establish gravel and wash thickness, basal contact, bedrock character, overburden and deposit continuity.
Sample volume and representivity, gold size distribution, recovery testing, assay QAQC, grade variability and uncertainty in conversion to recoverable metal.
Three-dimensional gravel and wash models, stripping volumes, water and access requirements, realistic test-work programmes and permit or consent considerations.
For Wairiri’s broader exploration capabilities, see the full services overview.
Mechanical test pits provide direct observations of the ground profile, gravel or wash thickness where present, material condition and depth to bedrock. A field log and a sampling method appropriate to gold size and variability are needed before using those exposures to estimate grade or recovery.
Wairiri logs geological contacts, wash thickness and bedrock character, then ties each sampling interval to its recovered volume and field test-work record. These observations feed directly into sections, volume models and the next drilling or pitting programme.
Field evidence
Individual pit and drill records are used together to interpret the gravel sequence and distinguish gold-bearing material from overburden. Processing trials help establish the gold size and recovery characteristics of the sampled material.
Evaluation method
Alluvial evaluation is not simply an average gold grade. The extent of the pay horizon, the amount of material above it and the proportion of gold that a proposed plant can recover must be considered separately.
Compare historic workings and landscape history with drill logs, test pits and mapped bedrock. Model the top and base of relevant gravel units, basal wash thickness and variations caused by palaeochannels, scour or bedrock highs. Extrapolation between isolated intersections is recorded as uncertain until supported by more coverage.
Choose drill or bulk-sample volumes with the gold particle-size distribution in mind. Coarse or sparsely distributed gold can produce high variability between small samples. Record dry or wet sample basis, material volumes, recovery losses, duplicate checks and where fines or oversize material were excluded.
Gold size, clay content, wash characteristics, processing method and operating conditions influence recovery. Compare measured test-work recovery with assumptions used in volume and grade models; don't apply a fixed recovery percentage without supporting evidence.
Calculate overburden and wash volumes from separate surfaces, examine strip ratios across the deposit rather than only at the average depth, and test access, groundwater, water supply, plant location, rehabilitation and consent constraints before relying on a mine schedule.
Where basal wash is intersected on either side of a bedrock high, targeted infill drilling or pitting and stratigraphic correlation can test whether a continuous pay horizon extends around the high. This controls how far a wash surface can reasonably be extended in the volume model.
Client deliverables can include a checked drillhole and test-pit database, correlated sections, wash and overburden surfaces, volume calculations, sampling and recovery records, and a prioritised programme for follow-up drilling or bulk sampling.
See the alluvial project capability · Geological modelling and QAQC
Permits and technical records
Alluvial projects need a work programme proportionate to what is already known. A permit application draws on the same logged ground observations, sampling records, geology and project constraints used to plan the next investigation.
Wairiri brings together previous mining and exploration records, geological maps, proposed drilling or pitting, sample quantities and test-work methods. The programme sets out the work by stage, its timing and the decision each stage is intended to inform. Where bulk sampling is proposed, its method and scale are specified rather than left implicit.
For mining-permit support, the work connects the mapped extent and thickness of mineralised gravel or wash with sampled grades, mineable volumes, overburden, recovery test work and a proposed mining sequence. Alluvial grades are commonly expressed in mg Au/m³ and material volumes in m³; contained gold and estimated recovered gold are reported separately where the data support both.
NZPAM publishes an alluvial-specific guideline, worked exploration and mining-permit examples, and a guide for supporting an alluvial gold mining permit application. The alluvial guideline dates from 2017 and contains references to the former Minerals Programme. Current applications should be checked against the Minerals Programme 2025 and current NZPAM forms.
Tier 2 alluvial permit guidance (NZPAM)Exploration-permit exampleCurrent application guidance
See Wairiri’s NZPAM permit application service for work-programme design, technical capability evidence and application preparation.
Start a conversation
We can review existing drilling, basal gravel interpretation, grade and recovery data before the next field programme.